The production accounting software our team works in, from field entry to agency filing
Month-end close starts in the field. Gauge readings, run tickets, and meter data flow into a production system, get allocated back to each well, and end up on state production reports and the OGOR. When any link in that chain breaks, the error shows up weeks later as a variance nobody can explain.
Our production team works on the following pieces of the production close process: facility setup, daily and monthly allocation checks, allocation network setups, purchaser reconciliations, and agency reporting. For operators not yet on a production system, we build spreadsheet templates that do the same job.
Systems at a glance
IFS Merrick P2 Suite
Peloton ProdView
Spreadsheet templates
Quorum
How we work in each system
What our analysts actually do in each platform, and the reports it feeds.
IFS Merrick P2 Suite
Peloton ProdView
Spreadsheet templates
Quorum On Demand Production
Where each system shines
Every platform has tasks it handles especially well. Here's where our analysts see each one at its best.
IFS ProCount
Peloton ProdView
Spreadsheet templates
Quorum On Demand
Where the data ends up
Whatever system it starts in, production data has to land on the right agency form every month. These are the reports we prepare and file.
Form 7/7W · Form 47 · Form 10
PR · P-18 · R-3 · G-10 · W-10
C-115
Form 2
Form 1012 (annual) · 1012D (weekly) · Sales reporting verified with OTC
Form 5/5B · 16 · 11 · 17
Form 5 · 5A
Form 7A · 11 SWD · 11 EOR
Form 5 · 6
Form 10 · 11 · 13A/13B · UIC 3
OGP · R5D
Form 10-H (quarterly) · 10 (annual)
EQP 7101/7101A
CG-7/7A · C-5 · U3C
Form 56442 (annual)
OGOR preparation, audits, and cleanup
Switching systems or acquiring assets?
A transition is the riskiest month in your reporting calendar. We audit what came before and rebuild it cleanly.
Review what the previous operator filed with agencies
Batteries, pads, and allocation networks in your system
Carry opening tank inventories over from the prior operator
Confirm setups and allocations tie out before the first close in your new system
Questions worth answering before month-end asks them for you
Talk to our production teamRelated Posts
Understanding the Requirements Behind Accurate Federal OGOR Production Reporting (ONRR).
By: Rebecca Long (Trujillo) |Last updated: August 27, 2026 OGOR reporting is rarely a problem in the month it is filed. It becomes a problem months later, when a misplaced measurement point or a carried-forward inventory has quietly grown into a reporting history nobody has reviewed. The Oil and Gas Operations Report (OGOR) is the […]
